| Issue Date | Title | Author(s) |
141 | 2012 | Scheduling in Flowshops With Flexible Operations: Throughput Optimization and Benefits of Flexibility | Gültekin, Hakan |
142 | 1-Feb-2016 | Scheduling in Two-Machine Robotic Cells With a Self-Buffered Robot | Gündoğdu, Emine; Gültekin, Hakan |
143 | 2011 | Self Controlling Tabu Search Algorithm for the Quadratic Assignment Problem | Fescioğlu, Ünver, Nilgün ; Kokar, Mieczyslaw M. |
144 | 2020 | A Semi-Markovian Renewal Reward Process With ?(g) Distributed Demand | Kamışlık, Aslı Bektaş; Alakoç, Büşra; Kesemen, Tülay; Khaniyev, Tahir |
145 | Feb-2014 | A Sharp Bound for the Ergodic Distribution of an Inventory Control Model Under the Assumption That Demands and Inter-Arrival Times Are Dependent | Hanalioğlu, Tahir ; Aksop, C. |
146 | 2010 | A Simulated Annealing Heuristic for the Dynamic Layout Problem With Budget Constraint | Şahin, Ramazan; Ertoğral, Kadir ; Türkbey, Orhan |
147 | 2024 | Simulation of Migration Paths Using Agent-Based Modeling: the Case of Syrian Refugees En Route To Turkey | Güngör Ö.; Günneç D.; Salman S.; Yücel E. |
148 | 2014 | Sistem Geliştirme Projelerinde Kullanılan Olgunluk Değerlendirme Araçları Üzerine Bir Literatür Araştırması | Babaçoğlu, Sinan; Akgün, İbrahim; Altın Kayhan, Ayşegül |
149 | Jun-2016 | Solving a Second Order Fuzzy Initial Value Problem Using the Heaviside Function | Akın, Ömer ; Khaniyev, Tahir ; Bayeğ, Selami; Türkşen, İ. B. |
150 | Jul-2014 | Some Asymptotic Results for the Semi-Markovian Random Walk With a Special Barrier | Aliyev, Rovshan; Kesemen, Tülay; Khaniyev, Tahir |
151 | 2014 | Some Possible Fuzzy Solutions for Second Order Fuzzy Initial Value Problems Involving Forcing Terms | Akın, Ömer ; Khaniyev, Tahir ; Oruc, O.; Türkşen, İsmail Burhan |
152 | 2022 | Stationary Characteristics for Renewal-Reward Process With Generalized Reflecting Barrier and Fuzzy Demands | Gever B.; Khaniyev T. |
153 | 2019 | Statistical Distributions and Reliability Functions With Type-2 Fuzzy Parameters | Khaniyev, Tahir ; Başkır, M. Bahar; Gökpınar, Fikri; Mirzayev, Farhad |
154 | 2009 | Stochastic Approximations for Optimal Buffer Capacity of Many-Station Production Lines | Cochran J. K.; Kokangül A.; Khaniyev, Tahir A. |
155 | 22-May-2018 | Strategic Fleet Sizing Problem in a Vendor Managed Inventory System With Predetermined Delivery Frequencies; a Fix and Optimize Heuristic | Dastjerd, Niousha Karim; Ertoğral, Kadir |
156 | 9-Mar-2018 | Synergy-Based Bidding Method for Simultaneous Freight Transportation Auctions | Kuyzu, Gültekin ; Olcaytu, Evren |
157 | 2018 | Şehir İçi Deniz Yolu Toplu Taşımacılığında Vapur Atama ve Rotalama Optimizasyonu: İstanbul Şehir Hatları Uygulaması | Yücel, Eda |
158 | 2013 | Technology and Financial Crisis: Economical and Analytical Views Foreword | Khaniyev, Tahir |
159 | 2016 | Tek ve Çift Tutuculu Malzeme Taşıyıcı Robotlu Akış Atölyelerinde Hat Dengeleme | Gültekin, Hakan |
160 | 2012 | Three-Term Asymptotic Expansion for the Moments of the Ergodic Distribution of a Renewal-Reward Process With Gamma Distributed Interference of Chancea | Bekar, Nurgül Okur; Aliyev, Rovshan; Khaniyev, Tahir |