Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11851/6158
Full metadata record
DC FieldValueLanguage
dc.contributor.authorŞahin, Ramazan-
dc.contributor.authorErtoğral, Kadir-
dc.contributor.authorTürkbey, Orhan-
dc.date.accessioned2021-09-11T15:35:07Z-
dc.date.available2021-09-11T15:35:07Z-
dc.date.issued2010en_US
dc.identifier.issn0360-8352-
dc.identifier.urihttps://doi.org/10.1016/j.cie.2010.04.013-
dc.identifier.urihttps://hdl.handle.net/20.500.11851/6158-
dc.description.abstractFacility layout problem has been extensively studied in the literature because the total material handling cost can be a significant portion in the operational costs for a company and in the manufacturing cost of a product. Today's severe global competition, rapid changes in technology and shortening life cycle of products force companies to evaluate and modify their facility layout in a periodic fashion. This type of layout problems is categorized as the dynamic facility layout problem (DFLP). As a realistic dimension of the problem, one has to consider also the limited budget to cover the cost of changing the layout. In this study, we propose a simulated annealing heuristic for the DFLP with budget constraint, and show the effectiveness of this heuristic on a set of numerical experiments. (c) 2010 Elsevier Ltd. All rights reserved.en_US
dc.language.isoenen_US
dc.publisherPergamon-Elsevier Science Ltden_US
dc.relation.ispartofComputers & Industrial Engineeringen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectFacility layout problemen_US
dc.subjectDynamicen_US
dc.subjectBudget constrainten_US
dc.subjectSimulated annealingen_US
dc.titleA Simulated Annealing Heuristic for the Dynamic Layout Problem With Budget Constrainten_US
dc.typeArticleen_US
dc.departmentFaculties, Faculty of Engineering, Department of Industrial Engineeringen_US
dc.departmentFakülteler, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümütr_TR
dc.identifier.volume59en_US
dc.identifier.issue2en_US
dc.identifier.startpage308en_US
dc.identifier.endpage313en_US
dc.authorid0000-0001-7074-4038-
dc.identifier.wosWOS:000280656300013en_US
dc.identifier.scopus2-s2.0-77955308743en_US
dc.institutionauthorErtoğral, Kadir-
dc.identifier.doi10.1016/j.cie.2010.04.013-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ1-
item.openairetypeArticle-
item.languageiso639-1en-
item.grantfulltextnone-
item.fulltextNo Fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.cerifentitytypePublications-
crisitem.author.dept02.4. Department of Industrial Engineering-
Appears in Collections:Endüstri Mühendisliği Bölümü / Department of Industrial Engineering
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

57
checked on Dec 21, 2024

WEB OF SCIENCETM
Citations

48
checked on Aug 31, 2024

Page view(s)

112
checked on Dec 23, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.