Please use this identifier to cite or link to this item: https://hdl.handle.net/20.500.11851/7227
Full metadata record
DC FieldValueLanguage
dc.contributor.authorKokangül, A.-
dc.contributor.authorKhaniyev, Tahir-
dc.contributor.authorCochran, J. K.-
dc.date.accessioned2021-09-11T15:56:02Z-
dc.date.available2021-09-11T15:56:02Z-
dc.date.issued2010en_US
dc.identifier.issn0143-2087-
dc.identifier.urihttps://doi.org/10.1002/oca.896-
dc.identifier.urihttps://hdl.handle.net/20.500.11851/7227-
dc.description.abstractMost production lines keep a minimal level of inventory stock to save storage costs and buffer space. However, the random nature of processing, breakdown, and repair times can significantly affect the efficiency of a production line and force the stocking of work-in-process inventory. We are interested in the case when starvation and blockage are preferentially avoided. In this study, a mathematical model has been developed using asymptotic approximation and simulation that provides asymptotic results for the expected value and the variance of the stock level in a buffer as a function of time. In addition, the functional relationship between buffer capacity and the first stopping time caused by starvation or blockage has been determined. Copyright (C) 2009 John Wiley & Sons, Ltd.en_US
dc.description.sponsorshipTUBITAK (Ankara, Turkey)Turkiye Bilimsel ve Teknolojik Arastirma Kurumu (TUBITAK)en_US
dc.description.sponsorshipThis research has been supported by a fellowship from TUBITAK (Ankara, Turkey). We also wish to thank two anonymous referees for helping to improve the clarity of presentation in this paper.en_US
dc.language.isoenen_US
dc.publisherJohn Wiley & Sons Ltden_US
dc.relation.ispartofOptimal Control Applications & Methodsen_US
dc.rightsinfo:eu-repo/semantics/closedAccessen_US
dc.subjectinventoryen_US
dc.subjectbuffer sizeen_US
dc.subjectrandom failuresen_US
dc.subjectrandom processing timesen_US
dc.subjectrenewal reward processesen_US
dc.titleOptimal control of work-in-process inventory of a two-station production lineen_US
dc.typeArticleen_US
dc.departmentFaculties, Faculty of Engineering, Department of Industrial Engineeringen_US
dc.departmentFakülteler, Mühendislik Fakültesi, Endüstri Mühendisliği Bölümütr_TR
dc.identifier.volume31en_US
dc.identifier.issue3en_US
dc.identifier.startpage201en_US
dc.identifier.endpage211en_US
dc.identifier.wosWOS:000278210200002en_US
dc.identifier.scopus2-s2.0-77953095884en_US
dc.institutionauthorKhaniyev, Tahir-
dc.identifier.doi10.1002/oca.896-
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.identifier.scopusqualityQ2-
item.fulltextNo Fulltext-
item.openairecristypehttp://purl.org/coar/resource_type/c_18cf-
item.languageiso639-1en-
item.cerifentitytypePublications-
item.openairetypeArticle-
item.grantfulltextnone-
crisitem.author.dept02.4. Department of Industrial Engineering-
Appears in Collections:Endüstri Mühendisliği Bölümü / Department of Industrial Engineering
Scopus İndeksli Yayınlar Koleksiyonu / Scopus Indexed Publications Collection
WoS İndeksli Yayınlar Koleksiyonu / WoS Indexed Publications Collection
Show simple item record



CORE Recommender

SCOPUSTM   
Citations

1
checked on Apr 20, 2024

WEB OF SCIENCETM
Citations

4
checked on Apr 20, 2024

Page view(s)

38
checked on Apr 22, 2024

Google ScholarTM

Check




Altmetric


Items in GCRIS Repository are protected by copyright, with all rights reserved, unless otherwise indicated.