02.4. Department of Industrial Engineering

Organization name
02.4. Department of Industrial Engineering
Parent OrgUnit
City
Ankara
Country
Turkey

OrgUnit's Researchers publications
(Dept/Workgroup Publication)

Refined By:
Date Issued:  [2010 TO 2019]
Author:  Gültekin, Hakan
Type:  Article

Results 1-14 of 14 (Search time: 0.003 seconds).

Issue DateTitleAuthor(s)
12011Atatürk havalimanı dış hatlar terminalinde kontuar atamaları için karar destek sistemi geliştirilmesiTaşkıncan, Abdullah; Bayrakçı, Erkin; Babat, Onur; Yüksel, Selim; Dalgıç, Özden Onur; Kayhan, Ayşegül Altın; Gültekin, Hakan 
22016Automated robotic assembly line design with unavailability periods and tool changesGültekin, Hakan ; Tula, Adnan; Aktürk, M. Selim
32010Bicriteria robotic operation allocation in a flexible manufacturing cellGültekin, Hakan ; Aktürk, M. Selim; Karasan, Oya Ekin
4Dec-2017Comparative Analysis of Load-Shaping-Based Privacy Preservation Strategies in a Smart GridKement, Cihan Emre; Gültekin, Hakan ; Tavlı, Bülent ; Girici, Tolga ; Uludağ, Süleyman
527-Feb-2018Cyclic scheduling of parts and robot moves in m-machine robotic cellsGültekin, Hakan ; Çoban, B.; Akhlaghi, V. E.
62019Energy conscious scheduling of a material handling robot in a manufacturing cellGürel, Sinan; Gültekin, Hakan ; Akhlaghi, Vahid Eghbal
72019The location-allocation problem of drone base stationsÇiçek, Cihan Tuğrul; Gültekin, Hakan ; Tavlı, Bülent 
82011Maximizing lifetime of event-unobservable wireless sensor networksBıçakcı, Kemal ; Gültekin, Hakan ; Tavlı, Bülent ; Bağcı, İbrahim Ethem
9Feb-2016Maximizing Wireless Sensor Network lifetime by communication/computation energy optimization of non-repudiation security service: Node level versus network level strategiesYıldız, Hüseyin Uğur; Bıçakcı, Kemal ; Tavlı, Bülent ; Gültekin, Hakan ; İncebacak, Davut
10Dec-2017Pure cycles in two-machine dual-gripper robotic cellsGültekin, Hakan ; Dalgıç, Özden Onur; Aktürk, M. Selim
112012Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibilityGültekin, Hakan 
121-Feb-2016Scheduling in two-machine robotic cells with a self-buffered robotGündoğdu, Emine; Gültekin, Hakan 
132010Throughput optimization in two-machine flowshops with flexible operationsCrama, Yves; Gültekin, Hakan 
142013Two-machine flowshop scheduling with flexible operations and controllable processing timesUruk, Zeynep; Gültekin, Hakan ; Aktürk, M. Selim